Report to itemised schedule
We price against the door references in your inspection report or FRA action list rather than creating a parallel numbering system that later has to be reconciled.
Who we work with
If you manage buildings rather than individual doors, the difficulty is rarely the repair itself — it is turning a long inspection schedule into priced, prioritised work that can be delivered around residents and reported back cleanly. That is the part we are set up for.
We price against the door references in your inspection report or FRA action list rather than creating a parallel numbering system that later has to be reconciled.
Where an existing doorset can reasonably be brought back to the required condition, we say so. Replacement is recommended where construction, condition or specification make repair unsound.
Items that affect a door closing and latching are separated from planned or cosmetic remedials, so you can see what is worth addressing first without us inventing statutory timescales.
Programmes sequenced by core, floor or block, with escape routes kept usable and doors left secure and operable at the end of each day.
Appointment windows, resident notice periods you control, and a clear outstanding list for doors that were not reached.
One set of references, one record format and one point of contact across several buildings, rather than a different approach per site.
Attach the inspection report or FRA action list to an enquiry and we will price it door by door.
Already have a fire door inspection report or FRA action list? Attach it securely to the enquiry form and we will price the remedial or replacement work door by door.
For more detail on the first stage, see what happens after a fire door inspection report, and on delivery around residents, see remedial works in occupied buildings.
Formal fire door inspections and written reports are arranged through a specialist fire door inspection contractor, kept separate from the remedial works. Parsec Fire Doors carries out the repair, replacement and installation work and records what was done — we do not issue third-party certification or declare a building compliant.
Fire door inspectionsAttach your inspection report, FRA action list or door schedule to an enquiry, tell us the site postcode and access arrangements, and we will come back with itemised costs.