What Happens After a Fire Door Inspection Report?

A practical guide for landlords, managing agents, responsible persons and property teams on turning a door-by-door inspection report or fire risk assessment action list into a prioritised, costed remedial programme — and on what to keep once the work is done.

Reading a Door-by-Door Report

Inspection reports vary widely in format and detail. Whatever the layout, the same handful of things determine what happens next.

Door reference and location

Every entry should be traceable to a specific door — a plot or flat number, a core, a floor or a door tag. Where references are missing or duplicated, agree a numbering approach early; it becomes the backbone of the scope, the pricing and the records afterwards.

The defect, not the verdict

A line marked as a failure tells you the door did not meet the criteria used, not what has to happen next. Read the described defect — gap dimensions, missing seals, closer performance, damage, unknown specification — because that is what determines the remedy and the cost.

Priority or risk rating

Most reports rate items in some way. Ratings differ between assessors, so treat them as the assessor's view of relative urgency for that building rather than a fixed national standard.

Evidence about the doorset

Note where the report records a label, plug, product information or an unknown specification. Doors of unknown specification usually need a different conversation from doors with a straightforward component defect.

Items outside the doorset

Reports frequently pick up signage, hold-open devices, surrounding construction, service penetrations and ironmongery. Some of these are quick wins; others belong to a different trade or a wider compartmentation programme.

Gaps in the survey

Doors recorded as no access, or areas not surveyed, need chasing. An action list with unsurveyed doors is not a complete picture of the building.

Urgent Items and Planned Remedials

Splitting the list into what needs attention now and what can be programmed is usually the most useful thing you can do with a report. The examples below are a general guide only; the priority for any given door depends on the building, the assessor's findings and competent advice. Timescales should follow that advice rather than a rule of thumb.

Typically treated as urgent

  • Doors that will not close fully or latch unaided
  • Missing, disconnected or wedged-open self-closing devices
  • Failures on doors protecting a single escape route or stairwell
  • Significant damage, holes or breaches through a leaf or frame
  • Doors missing entirely, or openings left without a fire door
  • Anything the assessor or fire risk assessor has explicitly flagged for immediate attention

Commonly planned into a programme

  • Worn or painted-over intumescent and smoke seals
  • Gap tolerances slightly outside the stated range
  • Hinge, latch and ironmongery upgrades
  • Missing or incorrect signage
  • Cosmetic damage to lippings, edges and facings
  • Doors of unknown specification awaiting a records search or replacement decision

Where a report leaves the remedy open — a door that may be repairable or may need replacing — our guide to fire door repair or replacement sets out how that decision is usually reached.

What to Send Us for Pricing

The more of the following you can share, the closer the first quotation will be to the final cost. Reports and action lists can be attached privately to our enquiry form.

The report or FRA action list
A PDF or spreadsheet of the door-by-door findings. Our enquiry form accepts private file attachments, so you do not need to summarise it first.
Door references and locations
Flat numbers, plot numbers, cores, floors or the assessor's own tags, so pricing lines up with the report you already hold.
Photographs
Particularly for damage, unusual doorsets, non-standard frames, glazing and anything the report describes as unknown.
Property type and postcode
Blocks of flats, HMOs, student accommodation, offices, care settings and schools all carry different access and working-hours implications.
Access and occupancy details
Who holds keys, whether residents need notice, and whether communal areas can be closed off for short periods.
Any deadline you are working to
A date set by an insurer, a fire risk assessor, an enforcing authority or your own programme, so the phasing can be built around it.

From Report to Costed Scope

  1. 1

    Review the report

    We work through the findings door by door and separate items we can price directly from items that need clarification, further evidence or another trade.

  2. 2

    Confirm on site

    A pre-works site assessment checks the doors we will be working on, measures what needs measuring and confirms the remedy for each one. This is a scoping visit for our own works — it is not a formal fire door inspection report.

  3. 3

    Price door by door

    Each door gets its own line: the defect, the proposed remedy, whether it is a repair or a replacement, and the cost. Programme rates can be applied where volumes justify them.

  4. 4

    Agree priority and phasing

    Urgent items are separated so they can proceed first. The remainder is grouped into phases that suit the building, the budget and the occupiers.

  5. 5

    Carry out the works

    Repairs and replacements are completed to the agreed scope, with variations raised where a door turns out to differ from the report.

  6. 6

    Hand over records

    You receive records of what was done to each door, including product information where it is available to us, so the works can be evidenced later.

Send us the report and we will price it door by door

Attach your inspection report or FRA action list to the enquiry form and we will come back with a prioritised, costed scope.

  • · Property type and site postcode
  • · Approximate number of doors
  • · Any inspection report or FRA action list
  • · Photographs of the doors in question

Already have a fire door inspection report or FRA action list? Attach it securely to the enquiry form and we will price the remedial or replacement work door by door.

Phasing Works in Occupied Buildings

Most remedial programmes happen around residents, staff or students. Where practical, we plan the work so that disruption is kept short and predictable.

Urgent items first

Doors that will not close and latch, or that protect an escape route, are usually separated out and completed ahead of the wider programme.

Group by block, core or door type

Working through one core, floor or door type at a time keeps each area disturbed once rather than repeatedly, and makes access arrangements simpler to communicate.

Flat entrance doors need notice

Access to private dwellings depends on residents. Grouping appointments and allowing for no-access revisits avoids stalling the rest of the programme.

Keep openings secure

Where a doorset is being replaced, the opening is made secure and usable again the same day wherever the work allows.

Match the budget cycle

Non-urgent items can be split across phases so spending fits a service charge, sinking fund or financial year, with priorities agreed in advance.

Track progress door by door

Because pricing is per door, completion can be reported the same way — useful when several buildings are running at once.

Records to Keep Afterwards

Once works are complete, the useful record is a clear trail from the original finding to the remedy. Keep the original report or action list alongside the scope you agreed, the records of the work carried out on each door, photographs where taken, and any product or component information supplied.

What you can typically expect to receive, and what is worth retaining in the building file, is covered in our guide to installation and handover documentation and in more detail in fire door records and close-out evidence after remedial works. If the building stays occupied throughout, see also remedial works in occupied buildings.

Reinspection and Independence

Parsec Fire Doors carries out repairs, remedial works, installation and replacement. We do not produce standalone formal fire door inspection reports, and we do not present our own works records as an independent verification of the work we have done.

Where a formal inspection or a reinspection after works is required, it can be arranged through a specialist fire door inspection contractor. Keeping the assessment separate from the works is often the more straightforward position to evidence later.